Mesoscale Parallel Experiment Log

Experiment
North American NEMS/NMMB parallel run
Parallel Slot
NAMZ
Control Slot
NAMX until 00z 3/24/2013, NAMZC thereafter
Start date of parallel experiment
12Z 2012/09/05
End date of parallel experiment
00z 2013/07/25
Experiment changes log
Background links
Evaluation of parallel results
Forecast maps : NAMZC vs NAMZ
Daily forecast stats
NAM Parallel and ops NAM 500 mb Height Forecasts vs GDAS analysis

Cumulative statistics during experimental testing:

NAM vs NAMZ vs NAMX Verification of precipitation and against rawinsondes / surface data (09/05/12-10/01/12)
NAM vs NAMZ vs NAMX Verification of precipitation and against rawinsondes / surface data (10/05/12-11/03/12)
NAM vs NAMZ vs NAMX Verification of precipitation and against rawinsondes / surface data (11/22/12-02/11/13)

NAMZC vs NAMZ vs NAMX Verification of precipitation and against rawinsondes / surface data (03/24/13-04/21/13)
NAMZC vs NAMZ vs NAMX Verification of precipitation and against rawinsondes / surface data (05/01/13-05/29/13)

Mesoscale Parallel Home Page

Disclaimer