Mesoscale Parallel Experiment Log

Experiment
North American WRF-NMM run with various analysis and/or physics changes
Parallel Slot
NAMX
Control Slot
NAM (Parallel Operational NAM run on mist)
Start date of parallel experiment
00Z 2006/10/24
End date of parallel experiment
12Z 2007/06/25
Experiment changes log
Background links
Evaluation of parallel results
Daily forecast maps vs ops NAM
Daily forecast stats
NAM,NAMX 500 mb Height Forecast vs GDAS analysis
NAM,NAMX Analysis Increments / Observations
NAMX Verification of precipitation and against rawinsondes / surface data (10/22/06-11/05/06)
NAMX Verification of precipitation and against rawinsondes / surface data (11/20/06-12/04/06)
NAMX Verification of precipitation and against rawinsondes / surface data (12/12/06-12/20/06)
NAMX Verification of precipitation and against rawinsondes / surface data (12/21/06-01/07/07)
NAMX Verification of precipitation and against rawinsondes / surface data (01/24/07-02/15/07)
NAMX Verification of precipitation and against rawinsondes / surface data (02/16/07-04/15/07)
NAMX Verification of precipitation and against rawinsondes / surface data (04/29/07-05/07/07)
NAMX Verification of precipitation and against rawinsondes / surface data (05/11/07-06/25/07)

Mesoscale Parallel Home Page

Disclaimer