GSI-GFS Hybrid (sigma-pressure)
Parallel
Experiment:
Operational GFS
(T382 L64 out to 180 h, T190 L64 out to 384 h), using a sigma-pressure
hybrid vertical coordinate.
New analysis
scheme (GSI),
performed on a 768 x 386 x 64 grid (post-processed to create spectral
coefficients for model)
Current
real-time experiment: PRZ
Verification:
Forecast Verification (
prz , pry
& ops)
More forecast
verification (
including
precipitation)
Fits to
observations (
prz
& pry)
Fits to
observations (
prz
& operations)
Error
diagnostics (
powerpoint)
Other Links:
Real-Time
Forecast
Verification:
Change
Logs:
Current
PRZ (updated 12 December 2005)
PRY
(experiment stopped 12 December 2005)
Misc.:
Branch
Briefings/Presentation:
Initial
GSI Briefing (07 July 2005)
If you have items related to
verification of the pry, feel free to pass
the information along.
Last update occurred 12 December 2005