Global Ensemble Forecast (GEFS) evaluation for CCS to TIDE porting:
Scores of the CONTROL forecast and ensemble spread
black: Oo =T254/190L42ET1.2+STTP1, GFSv9.1.0, GEFS Production on CCS
red: Od, same as Oo but on TIDE
Go Back to
Ensemble Home Page.
Go Back to EMC Home Page.